INDUSTRIAL COMPLEX
АРР 100.1
High reliability
of construction
Training
of customer's
personnel
Low cost per tonne
of recycling
The loading process
of municipal solid waste is continuous
Automated system
with numerical software
process control and continuous
safety monitoring
Mobility (not a capital structure).
Allows to move the complex
to another place in a short time
Modular design allows increasing
the volume of municipal
solid waste recycling
from 36,000 to 250,000 tons per year
in a short period of time
Possibility to use the received
thermal energy (3 MW/hour)
for heating or electricity generation
(0.5 MW/hour)
Fully Russian
development
Service (does not require
long waiting times
for spare parts)
Does not require
prior preparation of municipal
solid waste - shredding,
drying, sorting
the maximum permissible concentration!
Emissions of harmful substances into the atmosphere